Skip Navigation Links Teens Ass
Gay dating UK NDBC Title GraphicClick to go to NDBC home page Download Hangover, The Movie
Home News Skinny pussy

Station List

Observations
Mobile Access
Observations via
Google Maps

Classic Maps
Recent
Historical
DART
MMS ADCP
Obs Search
Ship Obs Report
Download Autodesk Autocad 2009 32bit
Download Adobe Dreamweaver CS3
Download Autodesk Navisworks Simulate 2010
Love dating UK
Download Up Movie
Dial-A-Buoy
RSS Feeds Image indicating link to RSS feed access page
Email Access

Station Status
NDBC Maintenance
NDBC Platforms
Partner Platforms

Program Info
About NDBC
Met/Ocean
Moored Buoy
C-MAN
Huge Dildos
DART
Skinny teens
CSP
IOOS DAC

Publications
NDBC DQC Handbook
Hurricane Data Plots
Sexy dating UK
Gay dating UK

Science Education

FAQ
Contact Us
Links

Love dating UK

DART Design Capabilities Test Procedures

The procedures/tests below are used by NOAA to demonstrate DART design capabilities. Different tsunami detection technology would have to have similar procedures/tests.

  1. Measurement: Sea-level amplitude at a continuous sample rate of 15 seconds over time.
  2. Measurement accuracy: Agreement within 1.0 cm in the observed tides deployed in similar depths off Hawaii within 100 nm of operational DART station using a standard tide model for tidal adjustments between stations.
  3. Measurement Resolution: 0.25mm at depths 1000-6000 meters.
  4. Performance measure: Comparison of Standard Mode data with harmonic tidal analysis shows agreement within 5 cm (average) over a 14 day period during the 120 day evaluation period.
  5. Reliability- 80% or better data return rate over 120 consecutive days.
  6. False triggers, not related to natural events: None during 120 day evaluation period.
  7. Data delivery; Request Mode*:
    • Gage Trip: Elapsed time from request for data to receipt of data at the tsunami warning center's server less than 10 minutes.
    • Gage 15sec data (1 hour duration): Elapsed time from request for data to receipt of data at the tsunami warning center less than 15 minutes.
  8. Data delivery; Event Mode*:
    • Gage Trip: Elapsed time from trip to receipt of data at tsunami warning center's server: less than 3 minutes; and display on the NDBC web site: less than 5 minutes (pre-selected times via software setup)
  9. Data acquisition tests*: At least one successful test acquiring one hour of 15 second data during 120 day evaluation period.
  10. Performance measure: Comparison of 15 sec data with DART station data with harmonic tidal analysis shows agreement within 5 cm (average) over a 1 hour period during the 120 day evaluation period.
  11. Other Bottom Pressure Recorder (BPR) commands tests**: At least one successful test for each of the following during 120 day evaluation period.
    1. Turn on "deployment mode" for 30 minutes.
    2. Retrieve engineering data from gage.
    3. Reboot BPR gage electronics.
    4. Reboot buoy electronics.
    5. Change tsunami detection threshold.
  12. Tsunami Test Mode: In the event of a detectable tsunami the test buoy tsunami data will be compared with operational DART station data. Amplitude and phase comparison should show 90% or better agreement after properly taking into account the differences in tsunami amplitude differences and arrival times between the two stations.
  13. Performance results are provided to and documented in accordance with standards of the NOAA Tsunami Program.

Note:
* These tests are to be conducted by tsunami warning personnel during 120 day evaluation period. Each test is documented.
** These tests are conducted by NDBC personnel during the 120 day evaluation period. Each test is documented.

Much of the material presented here was excerpted from the Technical Paper "Real-Time Deep-Ocean Tsunami Measuring, Monitoring, and Reporting System: The NOAA DART II Description and Disclosure;" by Meinig, Stalin, Nakamura and Milburn; June 4, 2005.


Download Proposal The Movie
Sexy dating UK
Love dating UK
National Data Buoy Center
1007 Balch Blvd.
Stennis Space Center, MS 39529
Contact Us
Page last modified: October 7, 2008
Download Proposal The Movie
Gay dating UK
Love dating UK
Gay dating UK
Sexy dating UK
Download Autodesk Autocad 2009 32bit
Download Hangover, The Movie
Skinny teens

Skinny pussy Teens Ass

Fresh teen pussy Download Up Movie